October 31, 2024
If it takes your workspace a long time to start, find out why and make some changes to your Coder templates to help speed things up.
Monitoring
You can monitor Coder logs through the system-native tools on your deployment platform, or stream logs to tools like Splunk, Datadog, Grafana Loki, and others.
Workspace build timeline
Use the Build timeline to monitor the time it takes to start specific workspaces. Identify long scripts, resources, and other things you can potentially optimize within the template.

You can also retrieve this detail programmatically from the API:
curl -X GET https://coder.example.com/api/v2/workspacebuilds/{workspacebuild}/timings \
-H 'Accept: application/json' \
-H 'Coder-Session-Token: API_KEY'
Visit the API documentation for more information.
Coder Observability Chart
Use the Observability Helm chart for a pre-built set of dashboards to monitor your Coder deployments over time. It includes pre-configured instances of Grafana, Prometheus, Loki, and Alertmanager to ingest and display key observability data.
We recommend that all administrators deploying on Kubernetes or on an existing Prometheus or Grafana stack set the observability bundle up with the control plane from the start. For installation instructions, visit the observability repository, or our Kubernetes installation guide.
Enable Prometheus metrics for Coder
Coder exposes a variety of
application metrics,
such as coderd_provisionerd_job_timings_seconds and
coderd_agentstats_startup_script_seconds, which measure how long the
workspaces take to provision and how long the startup scripts take.
To make use of these metrics, you will need to enable Prometheus metrics exposition.
If you are not using the Observability Chart, you will need to install Prometheus and configure it to scrape the metrics from your Coder installation.
Provisioners
coder server by default provides three built-in provisioner daemons
(controlled by the
CODER_PROVISIONER_DAEMONS
config option). Each provisioner daemon can handle one single job (such as
start, stop, or delete) at a time and can be resource intensive. When all
provisioners are busy, workspaces enter a “pending” state until a provisioner
becomes available.
Increase provisioner daemons
Provisioners are queue-based to reduce unpredictable load to the Coder server.
If you require a higher bandwidth of provisioner jobs, you can do so by
increasing the
CODER_PROVISIONER_DAEMONS
config option.
You risk overloading Coder if you use too many built-in provisioners, so we
recommend a maximum of five built-in provisioners per coderd replica. For more
than five provisioners, we recommend that you move to
External Provisioners and also consider
High Availability to run multiple
coderd replicas.
Visit the CLI documentation for more information about increasing provisioner daemons, configuring external provisioners, and other options.
Adjust provisioner CPU/memory
We recommend that you deploy Coder to its own respective Kubernetes cluster, separate from production applications. Keep in mind that Coder runs development workloads, so the cluster should be deployed as such, without production-level configurations.
Adjust the CPU and memory values as shown in Helm provisioner values.yaml:
…
resources:
limits:
cpu: "0.25"
memory: "1Gi"
requests:
cpu: "0.25"
memory: "1Gi"
…
Visit the validated architecture documentation for more information.
Set up Terraform provider caching
Template lock file
On each workspace build, Terraform will examine the providers used by the template and attempt to download the latest version of each provider unless it is constrained to a specific version. Terraform exposes a mechanism to build a static list of provider versions, which improves cacheability.
Without caching, Terraform will download each provider on each build, and this can create unnecessary network and disk I/O.
terraform init generates a .terraform.lock.hcl which instructs Coder
provisioners to cache specific versions of your providers.
To use terraform init to build the static provider version list:
-
Pull your template to your local device:
coder templates pull <template> -
Run
terraform initinside the template directory to build the lock file:terraform init -
Push the templates back to your Coder deployment:
coder templates push <template>
This bundles up your template and the lock file and uploads it to Coder. The next time the template is used, Terraform will attempt to cache the specific provider versions.
Cache directory
Coder will instruct Terraform to cache its downloaded providers in the
configured CODER_CACHE_DIRECTORY
directory.
Ensure that this directory is set to a location on disk which will persist across restarts of Coder or external provisioners, if you’re using them.